17: Test Your Knowledge
Name two kinds of constructed works.
True or False?
The steps in constructing buildings vary based on what type of building is being constructed.
A. True
B. False
Post offices and firehouses are examples of _____ buildings.
What is a manufactured home?
True or False?
Spread foundations are used on wet or sandy soils.
A. True
B. False
The two types of floors used in homes are concrete slab or ______.
What is a fascia board used for?
Name the two types of water systems that are part of a plumbing system.
_____ is trees, shrubs, and grass that are planted to help prevent erosion and improve the appearance of the site.
Sheathing the walls
A. Preparing the site
B. Setting foundations
C. Building the framework
D. Enclosing the structure
E. Installing utilities
F. Finishing the exterior and interior
G. Completing the site
Installing drywall
A. Preparing the site
B. Setting foundations
C. Building the framework
D. Enclosing the structure
E. Installing utilities
F. Finishing the exterior and interior
G. Completing the site
Grading
A. Preparing the site
B. Setting foundations
C. Building the framework
D. Enclosing the structure
E. Installing utilities
F. Finishing the exterior and interior
G. Completing the site
Installing footings
A. Preparing the site
B. Setting foundations
C. Building the framework
D. Enclosing the structure
E. Installing utilities
F. Finishing the exterior and interior
G. Completing the site
Landscaping
A. Preparing the site
B. Setting foundations
C. Building the framework
D. Enclosing the structure
E. Installing utilities
F. Finishing the exterior and interior
G. Completing the site
Installing a heat pump
A. Preparing the site
B. Setting foundations
C. Building the framework
D. Enclosing the structure
E. Installing utilities
F. Finishing the exterior and interior
G. Completing the site
Installing a subfloor
A. Preparing the site
B. Setting foundations
C. Building the framework
D. Enclosing the structure
E. Installing utilities
F. Finishing the exterior and interior
G. Completing the site
Installing the roof
A. Preparing the site
B. Setting foundations
C. Building the framework
D. Enclosing the structure
E. Installing utilities
F. Finishing the exterior and interior
G. Completing the site
Driving in piles
A. Preparing the site
B. Setting foundations
C. Building the framework
D. Enclosing the structure
E. Installing utilities
F. Finishing the exterior and interior
G. Completing the site
Marking the building site
A. Preparing the site
B. Setting foundations
C. Building the framework
D. Enclosing the structure
E. Installing utilities
F. Finishing the exterior and interior
G. Completing the site
Placing floor joists
A. Preparing the site
B. Setting foundations
C. Building the framework
D. Enclosing the structure
E. Installing utilities
F. Finishing the exterior and interior
G. Completing the site
Adding baseboards
A. Preparing the site
B. Setting foundations
C. Building the framework
D. Enclosing the structure
E. Installing utilities
F. Finishing the exterior and interior
G. Completing the site
Installing a sidewalk
A. Preparing the site
B. Setting foundations
C. Building the framework
D. Enclosing the structure
E. Installing utilities
F. Finishing the exterior and interior
G. Completing the site
What does the term
grade
mean, as used in this chapter?
On bridges, the _____ spreads the load of the bridge to the soil.
A. substructure
B. superstructure
C. deck
D. None of the above.
Tall dams holding back large quantities of water are called ______.